Features:
- The CIB connects the Smart Line Module power hardware to its SINAMICS S control-side signals.
- The documented replacement separates the original CIB functions between a common CIM and a matched IPD card.
- Exact replacement mapping identifies both required order numbers for the 500–690 V, 1200 A module variant.
The replacement CIM provides the common control-interface electronics used by the conversion.
The IPD card adapts that common module to the electrical and connector requirements of the assigned power unit.
Parameter reconciliation accepts the changed component structure and stores it for later power cycles.
The Siemens 6SL3353-6TG41-2CA3 SINAMICS S Control Interface Board may still be available for purchase and support from Apter Power beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 6SL3353-6TG41-2CA3 SINAMICS S Control Interface Board Manuals,Datasheets,Link
Important Notice: No product manual is attached to this item. Other accessories, manuals, cables, calibration data, software, etc. are not included unless listed in the above stock item description. All prices are shown in USD.
Connecting the line-module power unit to drive control
- Power-unit side: The board is assigned to the 500–690 V, 1200 A Smart Line Module configuration.
- Control side: CIB circuitry provides the interface functions used by the SINAMICS S control arrangement.
- Connector role: The original board carries the connection pattern used by the assigned line-module variant.
- Variant boundary: The complete order number must be retained because voltage and current class determine the matched hardware.
Replacing one CIB with two coordinated parts
- Common module: 6SL3350-6TK00-0EA0 supplies the CIM functions for the air-cooled power unit.
- Matched interface: 6SL3353-3AG41-2CA0 is the IPD card assigned to this exact CIB variant.
- Combined replacement: Neither order number alone represents the complete documented conversion.
- Hardware check: Both parts must be compared with the original line-module rating before installation.
Preserving signal assignments during the conversion
- Original layout: The CIB groups its control and power-unit connections on the original board arrangement.
- New layout: The CIM and IPD divide those connections across two coordinated assemblies.
- Plug change: New plastic connectors supplied with the replacement module must follow the documented terminal mapping.
- Cable record: Connector position and signal assignment should be recorded before the original board is removed.
Accepting the changed component structure
- Configuration level: Setting p9=1 opens the device-configuration stage used by the conversion.
- Component check: p9906=3 performs the documented comparison for the replaced component class.
- Completion: Returning p9 to zero leaves the configuration stage after the hardware is accepted.
- Stored result: p977=1 writes the accepted configuration to nonvolatile memory for subsequent power-up.