Features:
- Two copper and two fiber ports join protected PROFINET field segments.
- IRT switching, management and redundancy settings define how traffic crosses those ports.
- C-PLUG media can preserve the stored configuration outside the device.
Copper links connect nearby automation devices through push-pull RJ45 connectors.
SC-RJ fiber links carry the network across polymer or PCF optical segments.
The 24 V supply, signaling contact, IP65 enclosure and configuration record complete the field installation.
The Siemens 6GK5202-2JR00-2BA6 SCALANCE X202-2P IRT PRO Switch may remain available for quotation and support beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 6GK5202-2JR00-2BA6 SCALANCE X202-2P IRT PRO Switch Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Joining local electrical and optical network segments
- RJ45 ports: Two push-pull interfaces negotiate 10 or 100 Mbit/s copper links.
- SC-RJ ports: Two push-pull interfaces carry 100 Mbit/s over polymer or PCF fiber.
- Forwarding: The switch learns addresses and sends frames only toward the required port.
- Field boundary: Connector sealing and cable type preserve the intended IP65 installation.
Coordinating real-time PROFINET communication
- Device identity: DCP assigns the PROFINET device name and network settings.
- IRT schedule: Configured real-time traffic receives the planned transmission windows.
- Standard traffic: Ordinary Ethernet frames share the remaining switch bandwidth.
- Diagnosis: Port and PROFINET status identify a missing link or timing problem.
Restoring communication after a network break
- MRP: The switch participates in a configured media-redundancy ring.
- HRP: High-speed ring settings coordinate compatible Industrial Ethernet partners.
- PRP: Parallel redundancy settings support duplicated network paths where configured.
- Port plan: The selected protocol, manager role, ring ports, and recovery behavior stay in the project record.
Moving identity and settings to replacement hardware
- C-PLUG: Removable media carries the stored switch configuration.
- Secure access: HTTPS and SSH protect management sessions when enabled.
- Management data: IP address, VLANs, redundancy, SNMP, time, and port settings remain documented.
- Commissioning: Device name, links, IRT operation, alarms, and controller reachability are checked after transfer.