Features:
- The CP 1430 TCP supplies the SIMATIC S5 station with an Industrial Ethernet communication interface.
- Version 2.07 is the documented firmware level for the 2XV9450-1AU00 processor.
- NCM COM1430 TCP defines the communication connections used by the processor.
The 2XV9450-1AU00 sits in the S5 station and exchanges controller data through configured TCP communication services.
A separate adaptation capsule and TP cord form the physical path between the processor interface and the Ethernet network.
The communication project must align local and remote connection parameters; the hardware alone does not create the data exchange.
The Siemens 2XV9450-1AU00 CP 1430 TCP Communication Processor may still be available for purchase and support from Apter Power beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 2XV9450-1AU00 CP 1430 TCP Communication Processor Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Processor Role in the S5 Station
- Station interface: The CP 1430 TCP gives the S5 controller an Industrial Ethernet communication path.
- CPU relationship: Control logic remains in the CPU while the processor handles configured network exchanges.
- Peer connection: Both communication partners need matching endpoint and connection definitions.
- Data transfer: The configured job maps S5 data to the remote controller exchange rather than exposing arbitrary memory automatically.
Documented Hardware Chain
- Controller: The official example uses a SIMATIC S5 CPU 944 with the processor.
- Processor: 2XV9450-1AU00 provides the CP 1430 TCP hardware at firmware V2.07.
- Adapter: The documented adaptation capsule couples the processor interface to the Ethernet cable.
- Network cable: A 6 m IE TP CORD 15/RJ45 forms the physical link in the documented station.
Connection Configuration Tasks
- Engineering tool: NCM COM1430 TCP V2.07 is used for the S5 communication processor project.
- Local address: The S5-side parameters identify the CP and the local communication endpoint.
- Remote address: The partner endpoint must correspond to the S7 or other configured TCP station.
- Project consistency: Mismatched identifiers or addresses prevent the two configured jobs from pairing correctly.
Physical and Logical Boundaries
- Physical path: The adaptation capsule and TP cord establish the Ethernet connection from the CP.
- Logical path: TCP communication parameters define which controller data is exchanged.
- Processor scope: The CP handles network communication but does not replace the S5 CPU program.
- Version check: The documented hardware and NCM example both use version 2.07, so project files should be checked before reuse.