Features:
- 160 MB controller: The CPU shares the high-performance PM567x execution class.
- 8 GB flash disk: Integrated storage supports user files and data-handling workflows.
- Dual-network architecture: Two Ethernet interfaces complement serial and CAN connectivity.
This AC500 V3 CPU combines the 160 MB high-performance processor class with an integrated 8 GB flash disk.
The storage option supports applications that require local files or data logging alongside dual Ethernet, serial, and CAN communication.
Confirm file retention, backup, write-cycle expectations, terminal base, licenses, and network design before deployment.
The ABB PM5675-2ETH AC500 V3 Processor Module with Flash Storage is listed as Active / Available from OEM; quotations and sourcing support may be available through Apter Power.
ABB PM5675-2ETH AC500 V3 Processor Module with Flash Storage Manuals, Datasheets, Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
ABB PM5675-2ETH AC500 V3 Processor Module with Flash Storage Specs
General
- ManufacturerABB
- ModelPM5675-2ETH
- ConditionNew Original ready stock
- Product FamilyABB AC500 V3
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Logging design review
- Data set: Define required tags, format, rate, and retention period.
- Write load: Estimate file growth and avoid uncontrolled logging.
- Time base: Verify clock synchronization for usable records.
- Export: Document how files are retrieved and archived.
Integrated disk management
- Directory plan: Separate application, service, and log files.
- Capacity: Monitor remaining space during operation.
- Power loss: Use the approved shutdown and file-handling procedure.
- Security: Restrict file and FTP access under plant policy.
Controller recovery preparation
- Project: Keep the validated Automation Builder archive.
- User files: Back up logs and required configuration data separately.
- Firmware: Record the installed version and approved update path.
- Restore test: Verify recovery on a controlled system before relying on it.