Features:
- 15 kW and 31 A output in the larger R4 frame
- 408 W heat dissipation with 96 cubic metres per hour airflow
- 80 A IEC and UL fuse basis
ACS355-03E-31A0-4 is the R4 and 31 A configuration at the top of this requested ACS355 group.
Its machinery-control functions remain familiar, but the larger enclosure, conductors, feeder, heat load, and service clearances expand the project beyond a parameter change.
A controlled installation connects structural and electrical preparation with the motor and load study, EMC and safety design, braking and network behavior, staged tests, and an archived production baseline.
Availability is subject to Apter Power's current inventory and sourcing confirmation.
ABB ACS355-03E-31A0-4 ACS355 Machinery Drive Manuals, Datasheets, Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
ABB ACS355-03E-31A0-4 ACS355 Machinery Drive Specs
General
- ManufacturerABB
- ModelACS355-03E-31A0-4
- ConditionNew Original ready stock
- Product FamilyABB ACS355 Machinery Drives
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Mechanical and thermal readiness
- Support: Verify the backplate, fasteners, orientation, and cable forces.
- Width: Reserve the 260 mm enclosure width and service space.
- Cooling: Provide 96 cubic metres per hour without recirculation.
- Access: Keep terminals, panel connection, fan path, and isolation points reachable.
31 A feeder preparation
- Fault level: Coordinate isolation and the 80 A fuse basis with the site supply.
- Conductors: Check ampacity, short-circuit withstand, lugs, bend radius, support, and torque.
- PE and shields: Provide reliable protective earth and high-frequency bonding.
- Motor cable: Review length, insulation, routing, and any output-accessory requirement.
Staged production release
- Pre-power: Inspect identity, mounting, protection, PE, wiring, and safe isolation.
- No-load: Verify motor data, rotation, commands, STO, I/O, and communication.
- Loaded run: Record current, ramps, stops, temperatures, process response, and faults.
- Handover: Archive parameters, drawings, tests, maintenance tasks, and recovery steps.