Features:
- Two-part assembly: DIN-rail base with removable terminal block
- Termination: eight spring-clamp positions on the 1734-RTBS
- Service benefit: wired RTB can be removed without replacing every conductor
1734-TBS supports POINT I/O maintenance where a removable spring-clamp wiring block is preferred.
The detachable RTB can preserve field wiring during an approved module or base intervention.
Inspection of clamps, labels, keying, and seating remains necessary before the wired block is reused.
Availability of 1734-TBS is subject to Apter Power inventory and sourcing confirmation.
Allen-Bradley 1734-TBS POINT I/O 8-Terminal Spring-Clamp Base Assembly Manuals and Product Resources
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Allen-Bradley 1734-TBS POINT I/O 8-Terminal Spring-Clamp Base Assembly Specs
General
- ManufacturerAllen-Bradley
- Model1734-TBS
- ConditionNew Original ready stock
- Product FamilyPOINT I/O 1734
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Use the removable RTB
- Identity: match the eight-terminal 1734-RTBS block.
- Labels: preserve terminal numbering and conductor tags.
- Removal: de-energize circuits before separating the block.
- Reuse: inspect clamps and wire condition before transfer.
Restore the terminal assembly
- Wire preparation: follow bare-wire or ferrule tables.
- Seating: fully latch the RTB to the mounting base.
- Keying: retain the module-position setting.
- Verification: check field power and every affected channel after service.
Supported product applications
- Serviceable panels: preserve wired terminations during module work.
- Spring wiring: terminate eight correctly prepared conductors.
- Distributed stations: mount compatible POINT I/O modules on DIN rail.
- Spare planning: hold a documented base and replacement RTB combination.