Ask our team:
  • Phone: +86 181 0690 9650
  • E-Mail sales1@apterpower.com
  • Lifecycle status

    Active / Available from OEM
    Apter Power supports quotations, ABB documentation, redundancy checks, and paired-controller integration guidance.

SPC810ev2K02 7PAA006320R1201

/ 4.9
1001 reviews | Need a Specific Revision?
ABB SPC810ev2K02 7PAA006320R1201 is an active redundant Symphony Plus SDe controller kit with hot-standby processing and four Ethernet roles per controller.
In Stock
Ships by Thursday, October 29
Fast Shipping Available
Get a quick price for SPC810ev2K02 7PAA006320R1201
Quantity
*E-mail
Company
*Mobile
*Content
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)

Technical specifications for SPC810ev2K02 7PAA006320R1201

  • Manufacturer:
    ABB
  • Part Number:
    SPC810ev2K02 7PAA006320R1201
  • Product Family:
    ABB Symphony Plus SD
  • Product Type:
    Symphony Plus SDe Redundant Controller Kit
  • Stock:
    1
  • ABB Article:
    7PAA006320R1201
  • Controller Architecture:
    Redundant SDe controller kit
  • Redundancy:
    Yes
  • Processor:
    250 MHz per controller
  • Memory per Controller:
    128 MB DRAM; 2 MB MRAM; 4 MB flash
  • Control Capacity:
    5,000 I/O closed loops in under 250 ms
  • Redundancy Transfer:
    Within one scan cycle
  • Ethernet Roles:
    PN800A, PN800B, EN2A, EN2B
  • Protection and Temperature:
    IP20; -40 to +70 °C
  • Weight:
    1 kg
  • Estimated shipping dimensions:
    3.56x17.78x29.85cm
  • Tariff Code:
    Please confirm the destination before shipping
  • Country of origin:
    Sweden
  • Place of shipment:
    Xiamen,Fujian,China
By purchasing this item, you agree to the Terms & Conditions, ApterPower is not an authorized distributor for listed manufacturers or tradenames and therefore the manufacturer's warranty does not apply. All our products come with ApterPower's 1-year warranty.

More Information

Overview Manuals Specifications Redundancy Framework Network Roles Installation Plan

Features:

  • Hot-standby redundancy: The paired controller architecture transfers control when the active path becomes unavailable.
  • One-scan-cycle transfer: ABB documents redundancy switchover within one controller scan cycle.
  • Separated Ethernet roles: Process-network paths, service/time traffic, and Modbus TCP duties remain explicitly assigned.
SPC810ev2K02 7PAA006320R1201 is intended for availability-focused SDe control nodes where a single controller path cannot satisfy the process risk assessment.

Both sides of the pair must use matched hardware, firmware, application data, communication settings, and termination so that takeover does not introduce a configuration mismatch.

Commissioning is incomplete until primary and standby states, network failover, power-loss behavior, controller transfer, alarms, and recovery of the returned partner have been witnessed.

Availability is subject to Apter Power's current inventory and sourcing confirmation.
ABB SPC810ev2K02 7PAA006320R1201 Symphony Plus SDe Redundant Controller Kit Manuals, Datasheets, Link Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
ABB SPC810ev2K02 7PAA006320R1201 Symphony Plus SDe Redundant Controller Kit Specs

General

  • ManufacturerABB
  • ModelSPC810ev2K02 7PAA006320R1201
  • ConditionNew Original ready stock
  • Product FamilyABB Symphony Plus SDe Controllers
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.

Paired-controller deployment

  • Partner matching: Use the exact approved controller, adapter, and termination configuration on both paths.
  • Project parity: Keep firmware, application, parameters, and network definitions synchronized.
  • Transfer test: Witness controller switchover under the approved process test plan.
  • Return to service: Verify resynchronization and alarms before restoring full redundancy.

Communication-path assignment

  • PN800A and PN800B: Route redundant process-network connections through the paired PBA812 adapters.
  • EN2A: Maintain the documented service and time-synchronization function.
  • EN2B: Configure Modbus TCP only where the system architecture requires it.
  • Failure domains: Keep switches, cabling, and power paths separated where the availability design specifies.

Kit integration checks

  • MMU space: Reserve the documented two-slot mechanical arrangement for the redundant controller assembly.
  • Termination: Install and verify TER800 devices as required by the approved configuration.
  • Power budget: Calculate both controller paths and every communication adapter.
  • Acceptance record: Archive failover results, firmware, project checksum, topology, and alarms.
Description
SPC810ev2K02 7PAA006320R1201 is the redundant SDe controller configuration for Symphony Plus systems that require a hot-standby partner and automatic transfer of control when the primary controller becomes unavailable.

SPC810ev2K02 7PAA006320R1201 uses 250 MHz controller modules with 128 MB DRAM, 2 MB MRAM, 4 MB flash, four Ethernet roles, and a redundancy framework that ABB specifies can switch control within one scan cycle.

SPC810ev2K02 7PAA006320R1201 must be engineered as a complete redundant pair: cabinet slots, paired adapters, TER800 termination, identical project and firmware state, process-network paths, power, and switchover testing all require confirmation.
Alternative Names
SPC810ev2K02 SPC 810ev2K02 SPC810EV2K02 7PAA006320R1201 ABB SPC810ev2K02
Technical notes
SPC810ev2K02 7PAA006320R1201 is a redundant SDe kit; both controller paths require matched firmware, application, PBA812 adapters, TER800 termination, and verified 5 V DC node power. Before process release, test controller synchronization, separated PN800/EN2 network roles, switchover within the documented one-scan-cycle behavior, alarms, and partner return to service.
Exceptional Service

Our Mission

  • 100% Satisfaction

    We believe expertise is priceless. With over 20 years of experience, and top engineers on staff, we can help you solve or avoid problems that threaten your business.
  • Trust Guaranteed

    Not only do we have a vast inventory, our team makes sure every piece of equipment is in working condition. Your purchases are also backed by our Warranty.
  • Expertise

    Time is money, especially when your equipment is down. We work quickly to get your equipment on its way so you can get it back up and running.

FAQS

The following is a list of questions commonly asked by our customers. Please contact us if you have a question about our process that is not answered below.
Can SPC810ev2K02 7PAA006320R1201 replace a single SPC810e without redesigning the cabinet?
No automatic substitution is documented. The redundant kit changes slots, adapters, termination, power, project structure, networking, and acceptance testing, so the complete architecture must be reviewed.
What must match between the two SPC810ev2K02 7PAA006320R1201 controller paths?
Match controller articles, supported firmware, downloaded application, parameters, PBA812 adapters, termination, network roles, time settings, power design, and approved wiring.
How should SPC810ev2K02 7PAA006320R1201 switchover be tested during commissioning?
Use the plant-approved test plan to remove each defined failure source, verify takeover within the expected scan behavior, confirm outputs and alarms, then prove partner resynchronization.
Why can SPC810ev2K02 7PAA006320R1201 remain non-redundant after both controllers start?
Check partner discovery, firmware and application parity, redundancy links, adapter wiring, TER800 termination, network configuration, diagnostics, and any inhibited controller state.
How should SPC810ev2K02 7PAA006320R1201 network failure domains be separated?
Place process paths, switches, cabling, and power sources according to the approved availability design so one failure cannot disable both controller channels.
What should procurement confirm for an SPC810ev2K02 7PAA006320R1201 quotation?
Specify the exact article, redundant kit scope, adapters, TER800 devices, mounting hardware, quantity, condition, destination, inspection requirements, and delivery target.