Features:
- Sixteen normally open relay contacts switch compatible AC or DC field loads.
- Two eight-point groups provide separate commons and group-level fuse protection.
- A removable terminal block supports controlled replacement without rewiring every conductor.
The card is useful when one Series Five rack must operate field devices that are unsuitable for triac or transistor outputs. Each relay contact remains electrically distinct from the logic circuitry.
External 24 VDC powers the relay coils, while the PLC base supplies the module electronics. Both sources must be present before commanded outputs can operate.
Response is measured in milliseconds and contact wear varies with the connected load. Service decisions should include switching frequency, inrush, and observed contact condition.
For General Electric IC655MDL580 Relay Output Module pricing and official product documentation, Apter Power can assist with a current quotation.
GE Fanuc IC655MDL580 Relay Output Module Manuals, Datasheets, Links
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
How the sixteen relay outputs are arranged
- Group one: The first eight contacts share one protected common path.
- Group two: The remaining eight use a separate common and fuse.
- Source separation: Compatible AC or DC sources can be assigned by group when properly segregated.
- Terminal transfer: The removable block preserves the two-bank field layout during service.
Power paths required for relay operation
- Backplane load: The Series Five base supplies the module logic at 5 VDC.
- Relay source: An external 24 VDC supply energizes the output coils.
- Loss symptom: Commands may still be visible even when coil power is missing.
- Commissioning check: Measure both supplies under the expected simultaneous relay load.
Factors that affect relay contact life
- Resistive rating: Steady resistive current must remain within point and group limits.
- Inrush duty: Lamps, motors, and solenoids can stress contacts during pickup.
- Suppression: Apply field-device suppression suited to the connected AC or DC load.
- Operating rate: Frequent cycling should be considered when planning maintenance.
What to verify before returning the module to service
- Isolation: Remove rack power and every external field source before handling terminals.
- Fuses: Inspect both group fuses and determine why any fuse opened.
- Commons: Confirm the source assigned to each eight-point bank.
- Functional test: Exercise representative loads after the terminal block is secured.