Open now · we reply within 2 working hours

Talk to our team

+86 15359408275

Call and you reach an account manager, not a queue.


What happens next?

  1. Email confirmationYou will get an email confirming that we have received your enquiry.
  2. Dedicated Account ManagerOne of our team will be in touch to confirm your part(s) specification and condition.
  3. Your quoteYou will receive a comprehensive quote tailored to your specific needs.

Supplied with every order

  • Commercial invoice and packing list
  • Nameplate and packaging photographs
  • 12-month Apter Power warranty
Need a specific document format for your import process? Say so in the enquiry and we will confirm before you order.

Recommended to use with 745-W3-P511-G51-HI-R-E

  • RE400REPJH1ABA RE400REPJH1A
  • UR6CH Multilin UR 8 Form-C Digital I/O Module

All in stock · Add one and it is quoted together with the model, one shipping cost.

745-W3-P511-G51-HI-R-E

GE Multilin 745 three-winding transformer protection relay with 5/1/1 A phase CTs, 5/1 A ground CTs, restricted ground fault and enhanced display.

In Stock Ships by Wednesday, November 25 Fast Shipping Available
Dispatched within 24 hours of a confirmed order.
Nameplate and packaging photographs supplied before dispatch.
ISO 9001:2015 certified

Industry compliance and certified quality in every part we supply.

View certificate

Get a price for 745-W3-P511-G51-HI-R-E

745-W3-P511-G51-HI-R-EGeneral Electric Multilin 745 Three-Winding Transformer Protection Relay
Edit or add anything — monitor type, cable length, other part numbers.

Tell us which and we will shape the quote around it.

Attach a nameplate photo and an engineer will confirm the exact part number before quoting.

Answered within 2 working hours, Mon–Fri 09:00–18:00 GMT+8. Used only for this quotation.

Your Quote Request Has Been Received

Thank you. Our sales team will review your request and contact you shortly.

Ordering, delivery and after-sales

Your account managerNamed, start to finish

Your enquiry is picked up by a named account manager who checks the configuration before pricing and stays with the order through dispatch and after-sales. You are not passed round a shared inbox.

  • Direct email and WhatsApp for that person
  • Quotation signed by whoever prepared it
  • Same contact if anything needs sorting later

Enquiries are answered within 2 working hours, Mon–Fri 09:00–18:00 GMT+8.

Warranty12 months from shipment

Twelve months from date of shipment against functional defects under normal operating conditions. Because Apter Power is an independent supplier, the manufacturer’s own warranty does not apply — ours stands in its place, which on a discontinued part is the only cover there is.

If it arrives faulty or does not fitReturn authorisation same day

A written procedure, not a negotiation.

  • Report the fault within the 12-month warranty period
  • We issue a return authorisation the same working day
  • Return the unit within 14 days of reporting, in antistatic packaging where applicable
  • Replacement, repair or refund at our option, confirmed in writing
  • Return shipping on a confirmed warranty defect is at our cost

If it turns out to be a configuration mismatch rather than a fault, we help you identify the correct part instead of leaving you with the wrong one.

Pre-dispatch inspectionWhat we check — and what we don’t

Checked:

  • Part number and revision read from the unit nameplate, and photographed
  • Outer packaging and seals inspected and photographed
  • Connector threads and mounting stud checked for damage
  • Quantity and accessory contents verified against the packing list

Not checked: no powered functional or calibration test is performed on this item; sensitivity and frequency response are not re-certified by Apter Power; no hazardous-area certification is issued by us. If you need a functional test report before shipment, ask when you request the quote and we will confirm whether it is possible and what it adds to the lead time.

Our quality management is certified to ISO 9001:2015. More usefully, the scope above is published rather than summarised as “tested and approved” — nothing is implied that we did not do.

Shipping, customs and documentsDispatch in 24h · 170+ countries

Dispatch within 24 hours of a confirmed order for items held in stock. DHL, FedEx and UPS express to 170+ countries, typically 3–6 working days door to door; tracking is emailed the day the order leaves us. Shipping method and cost are itemised on every quotation and never added afterwards.

Most delays on an international spare are paperwork rather than freight, so the documents are prepared before the parcel leaves:

  • Commercial invoice and packing list on every shipment
  • Certificate of Origin prepared on request — ask at enquiry stage
  • HS code stated on the quotation, not discovered at clearance
  • We work to your broker’s format if you tell us what it is
PaymentTelegraphic transfer only

We accept payment by telegraphic transfer (T/T) only. Bank details appear on the pro-forma invoice and nowhere else — we never send revised bank details by email after quoting. If you receive a message claiming our account has changed, call +86 15359408275 before paying.

How to orderSend the part number

Send the enquiry above, or email the part number, quantity and destination country. In-stock items show a live quantity; where a part is not held we show "Ask" and confirm availability from our supplier network before quoting, so you are never quoted a lead time we cannot meet.

Discover the experience, people and global sourcing expertise behind Apter Power. About us »

Technical specifications

 set by the part-number suffix dotted  awaiting confirmation against the OEM datasheet

Part identification

Manufacturer
General Electric
Part Number
745-W3-P511-G51-HI-R-E
Product Family
GE Multilin
Product Type
Multilin 745 Three-Winding Transformer Protection Relay
Stock
1
Weight
8.33 kg
Estimated shipping dimensions
22.4x21.6x25.2cm
Tariff Code
Please confirm the destination before shipping
Country of origin
USA
Place of shipment
Xiamen,Fujian,China

More information

Features:

  • Three-winding differential protection with mixed 5 A and 1 A phase-current inputs.
  • Ground-current groups use 5 A and 1 A ratings for the defined winding zones.
  • Restricted ground-fault protection and the enhanced display support sensitive coverage and local review.
Transformer vector compensation, restraint and inrush blocking are configured for all three winding contributions.

The fully drawout case provides automatic CT shorting, while the high-range supply accepts common station AC or DC sources.

Event records, oscillography and programmable logic assist commissioning and post-trip analysis.

For General Electric 745-W3-P511-G51-HI-R-E Multilin 745 Three-Winding Transformer Protection Relay support, Apter Power provides quotations, technical documents and configuration review.
General Electric 745-W3-P511-G51-HI-R-E Multilin 745 Three-Winding Transformer Protection Relay Manuals,Datasheets,Link Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
  • Assign winding 1 to the 5 A phase inputs and windings 2 and 3 to the 1 A inputs.
  • Enter each transformer ratio, vector connection and CT ratio from the approved three-winding study.
  • Configure differential restraint, inrush blocking and zero-sequence treatment for the actual system grounding.
  • Validate FlexLogic, trip outputs and alarms with staged secondary-injection cases for every winding.
  • Separate and label 5 A and 1 A CT circuits before terminating rear-panel wiring.
  • Confirm the 5 A and 1 A ground-current groups serve the intended winding zones.
  • Check station power, trip circuits and drawout CT-short contacts before energization.
  • Use the enhanced display to compare winding currents only after ratio and polarity tests are complete.
  • Trend current, power and demand values by winding to identify loading imbalance.
  • Review event chronology and oscillography whenever differential or ground protection operates.
  • Use programmable inputs and outputs for approved breaker, alarm and interlock logic.
  • Confirm serial communication settings and point mapping before connecting the relay to SCADA.
  • Three-winding utility or industrial transformers with mixed 5 A and 1 A CT secondaries.
  • Transformers whose tertiary or secondary winding requires independent differential contribution.
  • Schemes requiring sensitive restricted ground-fault protection within defined winding zones.
  • Substations that use local metering, event analysis and serial SCADA integration.

Description

Three-winding transformer schemes are the intended context for 745-W3-P511-G51-HI-R-E. The P511 selection assigns a 5 A phase-current input to winding 1 and 1 A inputs to windings 2 and 3, while G51 provides the corresponding 5 A and 1 A ground-current groups.

Across the three windings, 745-W3-P511-G51-HI-R-E applies percentage-differential protection, vector compensation and inrush restraint. Its mixed CT-input ratings are deliberate ordering choices that need to follow each installed circuit's secondary rating.

Restricted ground-fault protection and the enhanced local display add sensitive earth-fault coverage and field access to metering, alarms and events on 745-W3-P511-G51-HI-R-E. Commissioning still requires winding-by-winding CT testing and an approved protection study.

Case studies

Order from our published case studies. Each one names the customer situation, the parts involved and what changed.

Leonia
IndonesiaBently Nevada 3500/22M 288055-01

On-Site Verification for an Indonesian Power Plant

After a previous suspected-counterfeit purchase, an Indonesian power-plant customer used a 50/50 payment plan, visited Apter Power to inspect two Bently Nevada 3500/22M 288055-01 modules, requested COO documentation and approved next-day hotel delivery.

100%Modules inspected on site
50/50Deposit / balance after inspection
“ They are very professional and supply quality products. I have purchased Bently Nevada products from them and had a very good experience. — Tri ”
Leonia · Indonesia · May 2026
Read the full case study
Yuki
Sudan9 ABB models · 20 components

After Six On-Site Reviews, a Sudanese Integrator Selects Apter Power for 20 Scarce ABB Components

After a two-to-three-year evaluation and five to six on-site visits, a Sudanese system integrator selected Apter Power from more than ten global suppliers for nine scarce ABB models and 20 components.

9Scarce ABB models
20Components supplied
“ This gave us the confidence to consolidate the order with one supplier. — Nadia ”
Yuki · Sudan · August 2025
Read the full case study
Jim
ChinaSGS inspection

SGS Verification for Global Automation Procurement

Documented third-party inspection helps procurement teams evaluate supplier processes, product conformity and pre-shipment evidence before cross-border automation orders move forward.

SGS ReviewIndependent evidence
4 StepsClear verification process
“ Verification should show what was checked and how it matches the buyer’s requirements. — Jim ”
Jim · China · 2026
Read the full case study

Where this item is used

The nine industries we publish solutions for. Each links through to that industry page.

FAQs

Questions we actually get about this item. If yours is not here, put it in the message field above.

About this part

When is 745-W3-P511-G51-HI-R-E appropriate for a three-winding transformer?

Use it when the protection design calls for three winding inputs, with 5 A phase CTs on winding 1 and 1 A phase CTs on windings 2 and 3. The ground CT groups must also follow the 5 A and 1 A order-code ratings.

How should CT wiring be organized before installing 745-W3-P511-G51-HI-R-E?

Label every phase and ground circuit by winding, secondary rating, polarity and terminal number before disconnection. Keep 5 A and 1 A circuits physically and procedurally distinct, then verify them against the approved protection drawings.

What is required to set restricted ground-fault protection in 745-W3-P511-G51-HI-R-E?

Define the intended winding zone, confirm the neutral and phase CT ratios and polarity, and verify the grounding path. Test both external-fault stability and internal-zone sensitivity for each enabled ground-protection element.

How should inrush restraint be tested on 745-W3-P511-G51-HI-R-E?

Use the approved protection study and staged secondary injection to verify differential restraint, harmonic blocking and trip logic across all three winding contributions. Do not copy settings from a two-winding transformer without calculation.

Can 745-W3-P511-G51-HI-R-E connect directly to an Ethernet SCADA network?

Not on the basis of this order code. The E option is the enhanced display, not Ethernet. Inspect the fitted rear communication ports and use a suitable serial interface or gateway if the project requires Ethernet connectivity.

What records are most useful after 745-W3-P511-G51-HI-R-E operates?

Collect the event sequence, waveform capture, differential and restraint quantities, harmonic content, digital inputs and breaker status. Compare all three winding currents and transformer conditions before classifying the operation.

Can't find the part number you need?

We quote thousands of parts that never appear on this site — current, obsolete and hard to find. Send the number and we will tell you honestly whether we can get it.

Mon–Fri 09:00–18:00 GMT+8 · enquiries answered within 2 working hours

Talk to our team

An account manager works the enquiry through with you — checking the configuration before pricing, rather than sending a price list back.

Mon–Fri 09:00–18:00 GMT+8 · Xiamen, China

ISO 9001:2015 certified

Every part we supply meets industry standards and comes from a certified quality management system.

View certificate

You may also like

RE400REPJH1ABA
RE400REPJH1ABA is a high-reliability industrial control module designed by GE (General Electric) for its Mark VIe control system. It is mainly used for signal processing and system interface applications in the control system.
UR6CH
GE Multilin UR6CH is a horizontal UR-family digital I/O module with eight Form-C relay outputs.
In stock
UR7KH
The GE UR7KH high-speed communication module is designed to facilitate secure point-to-point data exchange in power system protection networks and is specifically designed to address long-distance guided auxiliary protection schemes.
UR9EV
The GE UR9EV is a high-performance central processing unit (CPU) module for the Multilin UR series, featuring an ARM Cortex-A processor and extensive I/O for advanced protection and control.
In stock
750-P5-G5-HI-A1-R-E
GE 750-P5-G5-HI-A1-R-E is an enhanced-display Multilin 750 feeder management relay with 5 A phase and ground inputs, high-range control power, eight 0–1 mA analog outputs, and a red breaker-closed LED.
In stock
UR6TH
GE UR6TH is a 6T digital I/O module for the Multilin Universal Relay platform. It combines eight digital inputs with four Form-A outputs that do not include output-current monitoring.
In stock
UR6EV
GE Multilin UR6EV is a vertical-format Universal Relay I/O module with four Form-C outputs and eight digital inputs.
In stock
750-P5-G5-HI-A20-R
GE Multilin 750 feeder management relay with 5 A phase and ground inputs, high-range control power and 4–20 mA analog outputs.
In stock
750-P5-G5-S5-HI-A1-R-E-H
GE Multilin 750 feeder relay with 5 A phase, ground and sensitive-ground inputs, 0–1 mA outputs, enhanced display and conformal coating.
In stock
MTM-120(S-A20-120VA)
GE MTM-120(S-A20-120VA) is a Multilin meter-transducer execution identified by its 120 V input and A20 analog-output option for panel measurement conversion.
In stock

Looking for a part-number suffix that is not listed? We quote thousands of Bently Nevada configurations that never appear on the site — send the part number.

Same kind of part from other manufacturers:

Product browsing history

Request a quote WhatsApp Chat