Features:
- 36-inch panel-mounted IOTA carrier
- 24 VDC supply rail rated up to 40 A
- Thirty-two M5 grounding positions along the carrier
FC-MCAR-02 provides the mechanical base that aligns multiple Safety Manager IOTA positions across a control-panel installation.
The carrier also distributes the 24 VDC supply path and protective-ground connection points needed by the mounted hardware.
Its panel-mounted construction requires full-length enclosure support and deliberate cable routing rather than DIN-rail placement.
The Honeywell FC-MCAR-02 36-inch Panel-Mounted IOTA Carrier is listed as Active / Available from OEM. FC-MCAR-02 quotation requests and available Honeywell manufacturer documentation can be reviewed through Apter Power.
Honeywell FC-MCAR-02 36-inch Panel-Mounted IOTA Carrier Manuals, Datasheets, Links
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
What the FC-MCAR-02 Combines on One Base
- Mechanical frame: The 36-inch carrier combines a cable-carrier assembly, metal profile, and two plastic cover plates.
- Ground distribution: Its ground rail provides 32 screw positions for the mounted IOTA assemblies.
- Power distribution: Separate +24 V and 0 V rails provide the common supply path along the carrier.
- Surface mounting: Four mounting holes secure the carrier to a flat, rigid installation surface.
Securing Two IOTA-R24 Assemblies
- Carrier capacity: One FC-MCAR-02 is arranged to carry two IOTA-R24 assemblies.
- Ground fastening: Each IOTA-R24 is secured through ten ground-screw positions on the carrier.
- Power fastening: Two additional connections bring 24 V and COM from the carrier rails to each assembly.
- Replacement control: Record the installed position and field-cable mapping before removal so the two assemblies are not interchanged.
Arranging IOTA-NR24 Units on FC-MCAR-02
- Supported count: The carrier can accommodate up to three IOTA-NR24 units.
- Ground points: Each IOTA-NR24 uses eight ground-screw positions on the carrier ground rail.
- Power points: Two power connections per unit link 24 V and COM to the shared rails.
- Population check: Confirm unit count, spacing, and cable routing before adding or replacing an IOTA-NR24.
Extending Power Between FC-MCAR-02 Carriers
- Adjacent carriers: The power rails of two FC-MCAR-02 carriers can be coupled to extend the distribution path.
- Coupling hardware: The documented connection uses two M5 screws through the 5 mm rail holes.
- Polarity control: Keep +24 V and 0 V rails correctly paired and verify continuity before energizing the connected carriers.