Open now · we reply within 2 working hours

Talk to our team

+86 15359408275

Call and you reach an account manager, not a queue.


What happens next?

  1. Email confirmationYou will get an email confirming that we have received your enquiry.
  2. Dedicated Account ManagerOne of our team will be in touch to confirm your part(s) specification and condition.
  3. Your quoteYou will receive a comprehensive quote tailored to your specific needs.

Supplied with every order

  • Commercial invoice and packing list
  • Nameplate and packaging photographs
  • 12-month Apter Power warranty
Need a specific document format for your import process? Say so in the enquiry and we will confirm before you order.

Recommended to use with PCU-03

  • 3HAC5954-1 IRB 4400 Axis 2 Motor Unit
  • 3HNA023093-001 PDB-02 Power Distribution Board
  • 3HAC031184-003 Motor with Pinion

All in stock · Add one and it is quoted together with the model, one shipping cost.

PCU-03

ABB PCU-03 is a purge controller module associated with the Trallfa TR-5000 system and part number E-31978. Its front interface provides purge timing, status indication, and reset control.

In Stock Ships by Thursday, November 26 Fast Shipping Available
Dispatched within 24 hours of a confirmed order.
Nameplate and packaging photographs supplied before dispatch.
ISO 9001:2015 certified

Industry compliance and certified quality in every part we supply.

View certificate

Get a price for PCU-03

PCU-03ABB Trallfa TR-5000 Purge Controller Module
Edit or add anything — monitor type, cable length, other part numbers.

Tell us which and we will shape the quote around it.

Attach a nameplate photo and an engineer will confirm the exact part number before quoting.

Answered within 2 working hours, Mon–Fri 09:00–18:00 GMT+8. Used only for this quotation.

Your Quote Request Has Been Received

Thank you. Our sales team will review your request and contact you shortly.

Ordering, delivery and after-sales

Your account managerNamed, start to finish

Your enquiry is picked up by a named account manager who checks the configuration before pricing and stays with the order through dispatch and after-sales. You are not passed round a shared inbox.

  • Direct email and WhatsApp for that person
  • Quotation signed by whoever prepared it
  • Same contact if anything needs sorting later

Enquiries are answered within 2 working hours, Mon–Fri 09:00–18:00 GMT+8.

Warranty12 months from shipment

Twelve months from date of shipment against functional defects under normal operating conditions. Because Apter Power is an independent supplier, the manufacturer’s own warranty does not apply — ours stands in its place, which on a discontinued part is the only cover there is.

If it arrives faulty or does not fitReturn authorisation same day

A written procedure, not a negotiation.

  • Report the fault within the 12-month warranty period
  • We issue a return authorisation the same working day
  • Return the unit within 14 days of reporting, in antistatic packaging where applicable
  • Replacement, repair or refund at our option, confirmed in writing
  • Return shipping on a confirmed warranty defect is at our cost

If it turns out to be a configuration mismatch rather than a fault, we help you identify the correct part instead of leaving you with the wrong one.

Pre-dispatch inspectionWhat we check — and what we don’t

Checked:

  • Part number and revision read from the unit nameplate, and photographed
  • Outer packaging and seals inspected and photographed
  • Connector threads and mounting stud checked for damage
  • Quantity and accessory contents verified against the packing list

Not checked: no powered functional or calibration test is performed on this item; sensitivity and frequency response are not re-certified by Apter Power; no hazardous-area certification is issued by us. If you need a functional test report before shipment, ask when you request the quote and we will confirm whether it is possible and what it adds to the lead time.

Our quality management is certified to ISO 9001:2015. More usefully, the scope above is published rather than summarised as “tested and approved” — nothing is implied that we did not do.

Shipping, customs and documentsDispatch in 24h · 170+ countries

Dispatch within 24 hours of a confirmed order for items held in stock. DHL, FedEx and UPS express to 170+ countries, typically 3–6 working days door to door; tracking is emailed the day the order leaves us. Shipping method and cost are itemised on every quotation and never added afterwards.

Most delays on an international spare are paperwork rather than freight, so the documents are prepared before the parcel leaves:

  • Commercial invoice and packing list on every shipment
  • Certificate of Origin prepared on request — ask at enquiry stage
  • HS code stated on the quotation, not discovered at clearance
  • We work to your broker’s format if you tell us what it is
PaymentTelegraphic transfer only

We accept payment by telegraphic transfer (T/T) only. Bank details appear on the pro-forma invoice and nowhere else — we never send revised bank details by email after quoting. If you receive a message claiming our account has changed, call +86 15359408275 before paying.

How to orderSend the part number

Send the enquiry above, or email the part number, quantity and destination country. In-stock items show a live quantity; where a part is not held we show "Ask" and confirm availability from our supplier network before quoting, so you are never quoted a lead time we cannot meet.

Discover the experience, people and global sourcing expertise behind Apter Power. About us »

Technical specifications

 set by the part-number suffix dotted  awaiting confirmation against the OEM datasheet

Part identification

Manufacturer
ABB
Part Number
PCU-03
Product Family
ABB Robots
Product Type
Trallfa TR-5000 Purge Controller Module
Stock
1
Weight
0.86 kg
Tariff Code
8537109090
Country of origin
Sweden
Place of shipment
Xiamen, Fujian, China

More information

  • Trallfa TR-5000 purge controller module
  • Identification records associate PCU-03 with part number E-31978
  • Front controls support purge-timing selection, operating-status indication, and reset functions

ABB PCU-03 is a purge controller module associated with the Trallfa TR-5000 system. It supervises the timed purge sequence and presents Power, Purged, Purging, and Fault status information through its front interface.

Replacement suitability depends on the complete PCU-03 and E-31978 identity, connector arrangement, purge permissives, timing configuration, reset circuit, and protected-enclosure sequence.

Before installation, record the timing selections, indicator states, terminal assignments, airflow or pressure interlocks, and safe-state behavior required by the equipment procedure.

Availability, condition, price, and shipping time for ABB PCU-03 are confirmed during quotation.

ABB PCU-03 Trallfa TR-5000 Purge Controller Module Manuals, Product Family, Links

Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.

  • Selectable 100 s, 10 s, and 1 s timing positions
  • Purging and Purged states support sequence observation
  • Fault response must be proven before machine operation
  • Power indication confirms control-supply presence
  • Purging and Purged indications show sequence progression
  • Fault indication and Reset control support recovery diagnostics
  • Purge permissives and airflow conditions remain machine-specific
  • No hot-swap approval was located for ABB PCU-03
  • Commissioning must follow the protected-equipment procedure
  • Purge-sequence control in documented Trallfa TR-5000 installations
  • Enclosure-purge permissive and timing supervision
  • Fault and ready-state interfacing for purge-protected robotic equipment

Description

ABB PCU-03 is a purge controller module associated with the Trallfa TR-5000 system and part number E-31978.

Its front interface provides 100-second, 10-second, and 1-second timing selections together with Power, Purged, Purging, and Fault indications and a reset control. The available physical data lists dimensions of 4.1 × 25.3 × 24.4 cm and a product weight of 0.86 kg.

Replacement requires confirmation of the purge timing, permissive sequence, reset circuit, and fault response. Record the settings and wiring references, then complete the specified purge-cycle and interlock tests before enabling the connected equipment.

Case studies

Order from our published case studies. Each one names the customer situation, the parts involved and what changed.

Miya
ChinaQuality Inspection & Traceability

ISO 9001:2015 Quality Management Certification

Review the ISO 9001:2015 certificate for Apter Power, its certified scope, certificate number, validity, process-control purpose and the limits of management-system certification.

ISO 9001Certified quality system
TraceableDocumented order records
“ Certification matters only when the process is visible in everyday work—from the first requirement review to the final release. — Miya ”
Miya · China · August 2026
Read the full case study
Jim
Xiamen, ChinaBently Nevada

A Practical Bently Nevada 3500 Plan to Cut Factory Downtime

A practical factory deployment plan connecting 3300 XL proximity probes, a Bently Nevada 3500 rack, DCS/PLC systems and System 1 software to detect rotating-equipment risks earlier and support predictive maintenance.

3 LayersSensors to diagnostics
4 StepsPlanning to maintenance
“ A 3500 project starts with understanding machinery risks and maintenance needs. — Jim ”
Jim · Xiamen, China · 2026
Read the full case study
Leonia
IndonesiaBently Nevada 3500/22M 288055-01

On-Site Verification for an Indonesian Power Plant

After a previous suspected-counterfeit purchase, an Indonesian power-plant customer used a 50/50 payment plan, visited Apter Power to inspect two Bently Nevada 3500/22M 288055-01 modules, requested COO documentation and approved next-day hotel delivery.

100%Modules inspected on site
50/50Deposit / balance after inspection
“ They are very professional and supply quality products. I have purchased Bently Nevada products from them and had a very good experience. — Tri ”
Leonia · Indonesia · May 2026
Read the full case study

Where this item is used

The nine industries we publish solutions for. Each links through to that industry page.

FAQs

Questions we actually get about this item. If yours is not here, put it in the message field above.

About this part

What must be matched before replacing PCU-03?

Match PCU-03, the E-31978 reference where present, TR-5000 cabinet context, connector arrangement, purge timing settings and all status/reset wiring.

What should be recorded before removing PCU-03?

Record the 100 s/10 s/1 s timing selections, Power/Purged/Purging/Fault states, reset wiring, air or purge interlocks and cabinet terminals.

Can PCU-03 be commissioned without proving the purge sequence?

No. The purge permissive, timing, fault response and safe-state behavior must be tested under the machine's approved purge and hazardous-area procedure.

What does a Fault indication on PCU-03 require?

Check purge pressure or airflow permissives, timing selection, reset circuit, wiring and the protected enclosure sequence before blaming the controller.

Can PCU-03 be replaced by a generic timer module?

No. A generic timer does not establish equivalent purge interlocks, status logic, safe-state behavior or connector compatibility.

Why might PCU-03 remain in the Purging state without reaching Purged?

If PCU-03 does not reach Purged, verify that the pressure or airflow permissive remains continuously valid for the complete timing interval. Also check its timing-selector contacts, enclosure leakage, interlock continuity and fault/reset circuit.

What recovery behavior should be tested on PCU-03 after a purge interruption?

Simulate loss and restoration of the PCU-03 purge permissive, then confirm fault annunciation, removal of the protected-equipment enable, reset behavior and completion of a new full purge cycle before operation resumes.

Can't find the part number you need?

We quote thousands of parts that never appear on this site — current, obsolete and hard to find. Send the number and we will tell you honestly whether we can get it.

Mon–Fri 09:00–18:00 GMT+8 · enquiries answered within 2 working hours

Talk to our team

An account manager works the enquiry through with you — checking the configuration before pricing, rather than sending a price list back.

Mon–Fri 09:00–18:00 GMT+8 · Xiamen, China

ISO 9001:2015 certified

Every part we supply meets industry standards and comes from a certified quality management system.

View certificate

You may also like

Looking for a part-number suffix that is not listed? We quote thousands of Bently Nevada configurations that never appear on the site — send the part number.

Same kind of part from other manufacturers:

Product browsing history

Request a quote WhatsApp Chat