Features:
- Memory-retention role: The assembly supplies external battery backup to supported controller connections.
- Service-oriented format: A panel-mounted enclosure keeps the higher-capacity battery outside the controller chassis.
- Revision identity: The B suffix is part of the complete catalog record and should remain in the purchasing identity.
IC693ACC302B is intended for installations that need a longer controller memory-retention window than a standard internal battery arrangement can provide. It supports planned maintenance and extended shutdown periods on documented controller connections.
The module is a backup-energy accessory, not an operating power supply for the PLC. Its value is preserving volatile memory while normal controller power is unavailable or while battery service is being organized.
Product selection should be tied to the installed CPU and the required retention objective. The exact revision, controller connection, and maintenance plan define whether this external battery assembly is appropriate for the site.
Apter Power can help customers review official catalog records for IC693ACC302B, request a quotation, and coordinate sourcing.
General Electric IC693ACC302B External High-Capacity Battery Module Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
- Nominal battery capacity is 15 Ah
- Backup duration varies with the connected CPU
- Shelf life depends on storage time and conditions
- Use only the supported controller battery connector
- Verify polarity before making the connection
- Route the lead without pinch or abrasion risk
- Record the battery manufacturing and installation dates
- Plan transfer work to protect volatile memory
- Replace only under the approved controller procedure
- Extended RAM backup for supported Series 90-30 CPUs
- External backup support for documented IC697 connections
- Planned controller maintenance requiring longer backup duration