Features:
- Sixteen inputs and sixteen transistor outputs provide local 24 V DC control channels.
- Three high-speed counters acquire fast pulse or position signals up to 30 kHz.
- MPI and RS485 point-to-point interfaces separate engineering traffic from serial-device exchange.
Siemens 6ES7313-6BF03-0AB0 combines compact CPU execution and local I/O processing.
The serial interface of 6ES7313-6BF03-0AB0 follows the configured protocol and communication blocks.
A Micro Memory Card carries the load-memory path required by 6ES7313-6BF03-0AB0.
The Siemens 6ES7313-6BF03-0AB0 SIMATIC S7-300 CPU 313C-2 PtP Compact Controller may still be available for purchase and support from Apter Power beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 6ES7313-6BF03-0AB0 SIMATIC S7-300 CPU 313C-2 PtP Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Digital Signal Organization
- Input group: Sixteen 24 V DC inputs bring field states into the CPU process image.
- Output group: Sixteen 0.5 A transistor outputs switch connected 24 V DC loads.
- Front connector: One forty-pin connector carries the compact CPU field wiring.
- Fault check: Input LEDs, output LEDs, channel wiring, and output-group current separate logic faults from load faults.
High-Speed Technology Channels
- Counter count: Three integrated counters acquire fast pulse or position events.
- Frequency limit: Each documented high-speed counter operates up to 30 kHz.
- Pulse outputs: Three outputs can generate configured pulse-width or frequency signals up to 2.5 kHz.
- Project mapping: STEP 7 assigns physical terminals, modes, gates, and presets to each technology function.
Controller and Serial Communication
- MPI role: MPI provides programming, diagnostics, and supported controller-network communication.
- PtP role: The integrated RS485 interface exchanges data with one configured serial partner path.
- Protocol setup: Framing, baud rate, and communication blocks must agree with the connected device.
- Fault isolation: Separate interface diagnostics distinguish MPI loss from point-to-point errors.
Program Retention and Replacement
- Work memory: Sixty-four kilobytes hold the active user program and data.
- Load memory: A SIMATIC Micro Memory Card is required for the project load-memory path.
- Startup match: Hardware configuration, firmware, memory card, and integrated-I/O parameters must agree.
- Backup scope: The STEP 7 project and serial protocol settings should be preserved before replacement.