Features:
- Rear-frame assembly: ABB locates the balancing device behind the IRB 6700 arm structure
- Stored-energy control: a dedicated hydraulic press unloads the spring unit
- Variant-sensitive hardware: the front link-ear shaft determines its matching cover or plug
3HAC043477-002 is the complete IRB 6700 balancing device, distinct from the link-ear bearing kits and shaft components used during overhaul.
Its removal is a lifting and stored-energy operation that requires dedicated ABB press tooling before any load-bearing shaft is released.
Receiving and maintenance teams should align the exact robot variant with the installed shaft version and cradle hardware before scheduling work.
Apter Power can review 3HAC043477-002 article evidence, robot variant, external condition, lifting scope, and documented service requirements.
ABB 3HAC043477-002 IRB 6700 Balancing Device Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
- Spring unloading: use hydraulic press equipment 3HAC074411-001
- Tool instructions: follow the user document enclosed with the press
- Cover restriction: remove only the rear-cover attachment screws
- Arm restraint: secure the lower arm with the specified lock screw before shaft work
- Earlier shaft: 3HAC044036-001 uses VK cover 3HAA2166-12
- Later shaft: 3HAC072597-001 uses protection plug 3HAC4836-26
- Cradle covers: two 90x12 VK covers are documented
- Selection rule: identify the installed link-ear shaft before ordering consumables
- Lifting point: attach the shackle and ABB chain to the supported device
- Seal service: inspect link-ear seals, O-rings, and cradle covers
- Fastener retention: use the specified locking liquid where the procedure calls for it
- Corrosion protection: allow the documented Waxcoat drying interval before release
- IRB 6700 counterbalance replacement: exchange the complete rear-frame balancing assembly
- Stored-energy maintenance: unload and restrain the spring unit with ABB equipment
- Link-ear overhaul planning: match the shaft, cover, seals, and bearing hardware
- Heavy component sourcing: verify lifting, access, condition, and variant records before dispatch