Features:
- Axis-specific spare: ABB assigns the assembly to IRB 6650S axis 3
- Complete service package: motor, pinion, connection hardware, and O-rings share one order entry
- Foundry identity: grey Type A hardware is tied to the Foundry Prime build
3HAC058883-002 gives an IRB 6650S Foundry Prime repair team one controlled axis-3 motor package rather than several separately identified interface items.
Its order boundary lets receiving resolve drive, connection, and sealing completeness before the robot is opened.
Other axes and unverified robot variants remain outside this product scope.
Apter Power can help reconcile 3HAC058883-002 labels, package scope, condition, and official service references before quotation.
ABB 3HAC058883-002 IRB 6650S/6640 Axis-3 Motor with Pinion Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
- Drive assembly: ABB supplies the axis-3 motor with its pinion.
- Electrical housing: the connection box belongs to this order entry.
- Housing closure: ABB lists the connection-box cover.
- Sealing set: O-rings complete the documented package.
- Robot family: the documented platform is IRB 6650S.
- Installed position: ABB assigns this item to axis 3.
- Protection build: Foundry Prime identifies the Type A record.
- Finish evidence: grey supports but does not replace the complete label.
- Spare record: 3HAC049111-001 defines the order identity and successor rows.
- Service record: 3HAC020993-001 contains the IRB 6650S repair procedure.
- Motor chapter: ABB separates the axis-3 procedure from other robot axes.
- Calibration chapter: robot-reference restoration is documented independently of spare selection.
- IRB 6650S Foundry Prime repair: restore the documented Type A axis-3 motor position.
- Axis-3 spare planning: order the motor, pinion, connection box, cover, and seals as a controlled package.
- Configuration-led maintenance: link the robot record and removed assembly before procurement.