Features:
- FSA power stage for 380–480 V three-phase SINAMICS G120 systems.
- An integrated braking chopper manages the connection to a braking circuit.
- High-overload duty is defined by a timed 200/150/100 percent load cycle.
The PM240 hardware performs mains conversion and motor-side power control after a compatible Control Unit supplies the drive commands.
This order code identifies an unfiltered module, so the input arrangement must not be confused with PM240 versions containing an EMC filter.
Its FSA frame relies on an unobstructed internal cooling path and an enclosure design appropriate for IP20 equipment.
The Siemens 6SL3224-0BE17-5UA0 SINAMICS G120 Power Module may still be available for purchase and support from Apter Power beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 6SL3224-0BE17-5UA0 SINAMICS G120 Power Module Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Separating power hardware from drive control
- Mains stage: Three-phase AC enters the PM240 power section for conversion to the drive DC link.
- Control commands: A separate SINAMICS Control Unit supplies modulation and operating commands to the power stage.
- Motor connection: The output section delivers controlled three-phase power to the connected motor.
- Operator access: A Basic Operator Panel is not part of this order code and attaches through the drive control assembly.
Reading the timed high-overload cycle
- Starting peak: The 200 percent interval is limited to three seconds within the specified cycle.
- Heavy-load period: After the peak, the 150 percent segment can continue for 57 seconds.
- Recovery interval: The following 100 percent period lasts 240 seconds before the cycle repeats.
- Sizing basis: The 0.75 kW high-overload rating is tied to this complete thermal sequence.
Routing regenerated energy
- DC-link action: The integrated chopper switches when regenerated energy raises the DC-link voltage.
- External circuit: The braking connection carries the energy to the separately selected braking component.
- Order-code boundary: An integrated chopper does not mean that a braking resistor is included with the module.
- Wiring scope: Brake-circuit conductors and protection remain separate from the Control Unit signal connections.
Maintaining the module's thermal path
- Air movement: Internal cooling requires the specified cabinet air path around the FSA housing.
- Duty temperature: High-overload operation is rated through 50°C ambient.
- Moisture condition: The 95 percent humidity limit applies only when condensation is prevented.
- Altitude reference: The base installation rating applies through 1000 m before altitude derating is considered.