Features:
- The controller executes S7-1500 logic while operating at the head of an ET 200SP station.
- Separate program and data memories work with a required SIMATIC Memory Card.
- A three-port PROFINET switch uses an external BusAdapter for two physical ports.
Siemens 6ES7510-1DJ01-0AB0 combines the controller and ET 200SP station-head roles.
The memory card of 6ES7510-1DJ01-0AB0 carries the load-memory and project path.
PROFINET IRT on 6ES7510-1DJ01-0AB0 coordinates cyclic network communication.
The Siemens 6ES7510-1DJ01-0AB0 SIMATIC DP CPU 1510SP-1 PN Controller may still be available for purchase and support from Apter Power beyond End-Of-Life (EOL) by the manufacturer (OEM).
Siemens 6ES7510-1DJ01-0AB0 SIMATIC DP CPU 1510SP-1 PN Controller Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
Program, Data, and Load Storage
- Program area: The program work memory holds executable code and operating data used by the CPU.
- Data area: The larger data work memory stores user data independently of the code allocation.
- Load path: The required SIMATIC Memory Card carries the load-memory content and project files.
- Replacement: Restoring the correct card and project is necessary before a replacement CPU can reproduce the original application.
PROFINET Interface Arrangement
- Integrated interface: The CPU contains one PROFINET interface with IRT capability.
- Three-port switch: The interface is organized as three switched ports rather than three separate controller interfaces.
- BusAdapter path: Ports one and two obtain their physical connector format from the selected BusAdapter.
- Network project: Device name, IP settings, update time, and topology must match the downloaded configuration.
ET 200SP Head Assembly
- Head position: The CPU installs at the start of the ET 200SP module chain.
- Backplane feed: The CPU supplies the documented power budget to the downstream backplane.
- Server module: The station chain must terminate with the correct server module.
- Slot order: Installed I/O modules must follow the order and article numbers in the hardware project.
Commissioning Dependencies
- Supply check: The 24 V DC source must remain inside the permitted input range during startup and load changes.
- Card check: The correct SIMATIC Memory Card must be inserted and readable.
- Adapter check: The BusAdapter must match the intended cable and port arrangement.
- Diagnostic check: CPU, station, and PROFINET diagnostics should be reviewed before forcing outputs or changing hardware.