Ask our team:
  • Phone: +86 181 0690 9650
  • E-Mail sales1@apterpower.com
How We Verify Your Order
Before dispatch, we confirm the exact model, revision, condition, inspection requirements and shipping documents for your order.
See a real on-site verification case >>
  • Lifecycle status

    OEM Lifecycle Status Not Confirmed
    Apter Power supports exact-model quotation, technical documentation and installed-system matching.

NFCP100-S00 S3

/ 4.9
1001 reviews | Need a Specific Revision?
Yokogawa NFCP100-S00 S3 is the standard STARDOM FCN CPU module with controller memory, serial communication, dual Ethernet and SB-bus interfaces.
In Stock
Ships by Saturday, November 14
Fast Shipping Available
Get a quick price for NFCP100-S00 S3
Quantity
*E-mail
Company
*Mobile
*Content
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)

Technical specifications for NFCP100-S00 S3

  • Manufacturer:
    Yokogawa
  • Part Number:
    NFCP100-S00 S3
  • Product Family:
    Yokogawa DCS system
  • Product Type:
    STARDOM FCN CPU Module
  • Stock:
    1
  • System Family:
    Yokogawa STARDOM FCN
  • Processor:
    MMX Pentium 166 MHz
  • Main Memory:
    128 MB with ECC
  • Retentive Memory:
    1 MB SRAM
  • Network Interfaces:
    Dual Ethernet
  • Serial Interface:
    RS-232
  • System Bus:
    SB bus
  • Battery:
    2700 mAh lithium
  • System Current:
    1800 mA maximum at 5 V DC
  • Suffix:
    S00 S3
  • Weight:
    0.7 kg
  • Estimated shipping dimensions:
    6.5x14.5x13cm
  • Tariff Code:
    8537109090
  • Country of origin:
    Japan
  • Place of shipment:
    Xiamen,Fujian,China
By purchasing this item, you agree to the Terms & Conditions, ApterPower is not an authorized distributor for listed manufacturers or tradenames and therefore the manufacturer's warranty does not apply. All our products come with ApterPower's 1-year warranty.

More Information

Overview Manuals FCN Architecture Communications Startup Diagnostics Applications

Features:

  • STARDOM FCN controller CPU module
  • Ethernet, serial and SB-bus communication interfaces
  • Battery-backed controller memory for autonomous operation
Integration focus: Preserve the project, network settings and installed I/O architecture before controller service.

Engineering consequence: A healthy CPU can remain unreachable because of addressing, network or project-state problems, so startup evidence must be reviewed together.

Commissioning focus: Confirm stable node power, complete boot diagnostics and approved application state before reconnecting process outputs.

Apter Power supports the Yokogawa NFCP100-S00 S3 STARDOM FCN Controller CPU Module with exact-model quotation and node checks.
Yokogawa NFCP100-S00 S3 STARDOM FCN CPU Module Manuals,Datasheets,Link

Important Notice: Use the complete model, suffix and installed-system documentation before service or installation.

  • Confirm the CPU position, companion modules and node power arrangement against the installed FCN layout.
  • Keep the saved controller project aligned with the actual I/O population and communication modules.
  • A hardware change may require a controlled project download or system-software compatibility check.
  • Preserve network addresses and communication parameters before the controller is taken out of service.
  • If the CPU starts but is unreachable, check link state, addressing and switch port configuration before reloading the project.
  • Reconnect plant networks only after local startup diagnostics are normal.
  • Verify stable node power and observe the complete boot sequence before connecting process outputs.
  • Use controller diagnostics to separate project, network, I/O and hardware faults.
  • After any download, compare the running application state and I/O quality with the approved baseline.
  • Autonomous process-control and remote-unit applications using STARDOM FCN.
  • Oil, gas, water, energy and infrastructure sites requiring distributed local control.
  • Maintenance of installed FCN nodes where control, communications and I/O coordination must be restored together.
Description
Yokogawa NFCP100-S00 S3 is the CPU module at the center of an FCN-100 autonomous controller, executing the control application and coordinating the local I/O and network interfaces of the field control node.

ECC memory, processor self-diagnostics, temperature monitoring and I/O diagnostics give NFCP100-S00 S3 the controller-level fault visibility documented for the NFCP100 platform, while the FCN design supports fanless operation.

Within the FCN-100 architecture, NFCP100-S00 S3 can be used in a standard control unit or in supported duplex configurations with redundant CPU, power and SB-bus paths; NFBU200-based systems can also extend I/O through additional units.
Alternative Names
NFCP100 S00 S3 NFCP100-S00 Yokogawa NFCP100-S00 S3 STARDOM NFCP100 FCN CPU module NFCP100 controller CPU
Technical notes
NFCP100-S00 S3 is the standard FCN CPU module. Preserve the controller database, network settings, battery-backed SRAM data and complete S00 S3 suffix when servicing or pairing the controller.
Exceptional Service

Our Mission

  • 100% Satisfaction

    We believe expertise is priceless. With over 20 years of experience, and top engineers on staff, we can help you solve or avoid problems that threaten your business.
  • Trust Guaranteed

    Not only do we have a vast inventory, our team makes sure every piece of equipment is in working condition. Your purchases are also backed by our Warranty.
  • Expertise

    Time is money, especially when your equipment is down. We work quickly to get your equipment on its way so you can get it back up and running.

FAQS

The following is a list of questions commonly asked by our customers. Please contact us if you have a question about our process that is not answered below.
What should be checked when NFCP100-S00 S3 does not boot?
Confirm the 5 V system supply, module seating, rack condition and startup indications before reloading software or replacing the CPU.
Why can an Ethernet link remain down after installing NFCP100-S00 S3?
Check the assigned port, cable, switch port, IP settings and controller database. A healthy CPU does not correct a mismatched network configuration.
What should be saved before removing NFCP100-S00 S3?
Back up the controller database, IP parameters, serial settings, application version and any battery-backed SRAM information required by the site procedure.
What can cause retained data loss around NFCP100-S00 S3?
A depleted or disconnected lithium battery, prolonged de-energization or improper service can affect SRAM retention. Follow the approved battery procedure before shutdown.
Can NFCP100-S00 S3 be moved into another FCN slot without review?
Do not assume so. Confirm the exact suffix, rack role, controller architecture, database assignment and network connections for the destination position.
How should NFCP100-S00 S3 be verified after installation?
Confirm normal boot, both required network links, RS-232 and SB-bus communication, controller scan status, watchdog condition and temperature diagnostics.