Features:
- Defined assembly: ABB describes the item as a motor including pinion
- Type designation: Std / Foundry+ 2198 W / 4 Nm
- Official ordering record: sold as one piece under the exact Product ID
ABB 3HAC057549-003 links the electrical drive and its pinion to one documented service-spare identity.
Its Std / Foundry+ designation separates the requested configuration from motors carrying different application or finish records.
The official Product Details also supplies model-specific origin, tariff, mass, and dimensional data for logistics planning.
Apter Power can review 3HAC057549-003 label evidence, documented assembly scope, condition, official records, and shipment readiness.
ABB 3HAC057549-003 Robot Motor with Pinion Manuals,Datasheets,Link
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
- Product ID: the complete order identity is 3HAC057549-003.
- ABB designation: Std / Foundry+ is part of the configured type.
- Rated descriptor: ABB records 2198 W / 4 Nm in the type designation.
- Catalog wording: the official description is motor including pinion.
- Core item: the documented supply is a robot motor assembly.
- Drive element: the pinion is included in the catalog description.
- Order unit: ABB sells the item by the piece.
- Quantity rule: the minimum and order multiple are each one piece.
- Installed evidence: retain the full motor label and robot record.
- Mechanical evidence: document the pinion and mating interface before removal.
- Electrical evidence: capture connector orientation and cable routing.
- Return-to-service evidence: preserve calibration and controlled-motion results.
- ABB robot axis service: replace a documented motor-and-pinion assembly under the exact Product ID.
- Foundry-configured maintenance: retain the Std / Foundry+ designation during sourcing.
- Planned outage preparation: align the motor label, mechanical-unit record, and service procedure.
- Incoming inspection: verify the complete assembly and model-specific logistics record before installation.