Features:
- Uses M10 x 1 probe mounting with without armor construction.
- Combines 0 mm unthreaded length, 250 mm case length and a 0.5 m (20 in) probe lead.
- Terminates through 02 = clickloc connector, standard cable.
The current ordering configuration is 330905-00-25-05-02-CN, combining M10 x 1 mounting, without armor, 0 mm unthreaded length, 250 mm overall case and a 0.5 m (20 in) probe cable.
It senses close-clearance shaft motion for compressor vibration, axial-position, timing-reference or speed measurements through a matched 3300 XL NSv transducer system.
Before installation, verify thread engagement, insertion depth, cable type, connector protection, electrical system length, target material and the approval marked on the delivered probe.
Availability is subject to Apter Power inventory and sourcing confirmation.
Verified resources for Bently Nevada 330905-00-25-05-02-CN:
Important Notice: Other accessories, manuals, cables, calibration data, software, etc. are not included with this equipment unless listed in the above stock item description. All prices are shown in USD.
- Measures radial shaft vibration in compact compressor or rotating-machine installations.
- Tracks axial shaft position where restricted target size favors the narrow-side-view NSv system.
- Provides Keyphasor, tachometer or zero-speed input from an appropriate rotating target.
- The probe lead length is 0.5 m (20 in) and the selected termination is 02 = clickloc connector, standard cable.
- The probe is supplied without armor, which determines the mechanical protection of the lead.
- CableLoc construction provides the documented 220 N attachment strength at the probe tip.
- The NSv probe supports the temperature limits defined in Datasheet 147385 for its cable construction.
- The matching sensor storage range is -52 to +105 C.
- At 100% condensing humidity, protect ClickLoc junctions and keep the assembly non-submerged.
- Select the case length from actual port depth and required static gap, not from cable length.
- Choose connector protection according to expected oil, moisture and maintenance exposure.
- Confirm whether the project requires a documented 05 approval option before purchase.